Detalhes do Projeto

S. JOÃO BRIDGE

Owner: Gabinete do Nó Ferroviário do Porto
Site: Porto – Portugal
Conclusion year: 1991

 

Total length     1 140   ml

Central span    250   ml

Earthworks      350 000   m3

Micropiles        2 160   ml

Formwork         221 000   m2

Reinforcing steel       18 100   tn

Concrete      110 000   m3

Prestress      27 620 000   tfm

Cimbres and capping bars         320 000   m3

Railway      8 700   ml

Elements of metal construction      3 500   tn

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.