Detalhes do Projeto
PINHAL NOVO STATION AND INTERFACE
Client: REFER – Rede Ferroviária Nacional, E.P.
Location: Pinhal Novo – Portugal
Execution Period: 20 Months
Construction of the passengers building and platforms, including foundations, reinforced concrete structures, metallic structures, waterproofed roof, water and sewage networks, structural works and finishes, electrical and mechanical installations. Detection and safety systems, HVAC, mechanical and lifting means. Execution of the station’s interface, with passages and parking lots. Execution of railway track infrastructure, namely earthworks, drainages, retaining walls, concrete pedestrian underpass, culverts and fences. Execution of the track superstructure, comprising track removal and laying, ballast removal and application, lateral displacements of the track, welding and all finishing works.
Railway track works: 8.324 lm