Detalhes do Projeto

VSE TIETÊ LINE 06 SÃO PAULO SUBWAY

Client: Consórcio Expresso Linha 6 – CEL6
Location: Rua Eng. Edgard Ferreira de Barros de Barros Junior – São Paulo – Brasil
Execution Period:  5 months

 

Installation of vertical Bored Piles with metal casing and stabilizing fluid, including concreting and conventional armoring, in soil with SPT below and above 50 strokes, with an auxiliary 200 ton crane, compatible with the service foreseen in the project, relating to the suspension of approximately 50 ton armor.

Amount of work

Ø 240 cm piles 1,112.98 m³

Drilling of Ø 0.80 m CCP type vertical Jet-Grouting columns:

SOIL drilling 4,600.00 m

Ascending hydraulic pre-rupture 1,155.52 m³

Installation of CCP type columns 2,311.04 m³