Detalhes do Projeto

HOSPITAL PROF. DR. FERNANDO DA FONSECA

Client: Ministry of Health
Location: Amadora – Portugal
Execution Period: 52 Months

 

Capacity: 686 beds

Civil Works
Number of floors: 6
Floor area: 71 930 m2
Roof area: 26 300 m2
Plot area: 170 600 m2
Earthworks: 274 000 m3
Formwork: 148 500 m2
Concrete: 35 000 m3
Steel: 3 180 tons
Steel in metallic structures: 100 tons
Masonries: 95 000 m2

Supply and assembling of all hospital equipment
Laboratories: 2 440 m2
Lo and Medium voltage electrical network
UPS
Emergency station
Lifts 20: units
Centralised technical management
Incineration
Sterilisation
Thermal central, air conditioned, ventilation and central heating
Security, fire detection and extinction
Central of industrial compressed air, medical gases and vacuum Kitchens, break-room, self-service and bars
Water and Sewage Network
Waste water and industrial water treatment plant
Pneumatic transport of documents

 

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.