Detalhes do Projeto

DRAINAGE FOR RESIDUAL, RAIN AND IRRIGATION WATERS INCLUDING SUPPLEMENTARY MEASURES TO PREVENT RISING WATER TABLE IN VALE DE EL OUED (SECTION 2) – AERATED LAGOON STATIONS

Owner: ONA – Office National de l’Assainissement
Site:  – Argélia
Conclusion year: 2010

Construction of 3 waste water treatment plants, aerated lagoons type, with 40, 42 and 20 hectares respectively.

 

The works consisted in the execution of:

 

  • 3 ventilated ponds (helical aerators);
  • 3 decanting ponds;
  • Sludge dewatering beds;
  • Pre-treatment, flow distributor and connection ducts works;
  • Protection against wind and sand;
  • Operation and accommodation buildings;
  • Accesses and landscaping.

 

Earth movement  1 100 000 m3

Geo membrane  280 000 m2

Geotextile  365 000 m2

Reinforced concrete  2 100 m3

Tubing PEAD  4 600 m

 

Incorporation of hydro mechanical and electromechanical equipment.

Operation and maintenance of complex for 24 months.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.