CONSTRUCTION/OPERATION OF THE ALI MENDJELI WASTE WATER TREATMENT PLANT – ALGERIA

Owner: ONA – Office National de l’Assainissement
Site: Nouvelle Ville Mendjeli – Constantine – Algeria
Conclusion year: 2018

Construction of a Wastewater Treatment Plant (biological treatment).

 

2440x1220mm “Backelise” Plywood  22 435 m2

Concrete C30/37 (S4)  12 905 m3

Concrete C25/30 (S4)  60 m3

Concrete C16/20 (S3)  1 780 m3

“Water stop” Sealing gasket, 24cm wide  1 620 ml

12mm Concrete frameworks  1 130 880 kg

Bitumen emulsion “Flint-kot” type  4 840 m2

Galvanized steel grid  188 ml

Sealing mortar  13 453 kg

Supply and assembly of a barrier and handrail in 316 L stainless steel (1.10 m high)  665 ml

Supply and assembly of a galvanized steel stair including barrier  36 ml

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.