Detalhes do Projeto

LINE 02 OF THE SALVADOR SUBWAY – INSTALLATION OF A PERMANENT TRACK ON THE TOP DOWN

Client: Mobilidade Bahia Consortium, formed by: Construções e Comércio Camargo Corrêa S.A. (leader) and Andrade Gutierrez Engenharia S.A.
Location: Salvador – Bahia – Brazil
Conclusion Year: 2016

 

Installation of a permanent concreted track in the Top Down system, installation of a switch on concreted track, electric welding (fusion welding process), exothermic welding and (thermal) strain relief.