Detalhes do Projeto

S. JOÃO BRIDGE

Owner: Gabinete do Nó Ferroviário do Porto
Site: Porto – Portugal
Conclusion year: 1991

 

Total length     1 140   ml

Central span    250   ml

Earthworks      350 000   m3

Micropiles        2 160   ml

Formwork         221 000   m2

Reinforcing steel       18 100   tn

Concrete      110 000   m3

Prestress      27 620 000   tfm

Cimbres and capping bars         320 000   m3

Railway      8 700   ml

Elements of metal construction      3 500   tn