The construction works mark the start of the plan to update the Beira Alta Line – the Guarda-Cerdeira subsection of the Guarda-Vilar Formoso Section – which Infraestruturas de Portugal, S.A. (IP) assigned to Teixeira Duarte – Engenharia e Construções, S.A., for nearly 8.7 million euros, to be completed within ten months

In a ceremony held at Guarda Railway Station, attended by the Minister of Infrastructures and Housing, the European Coordinator for the Atlantic Corridor and IP’s Board of Directors, the project update the Beira Alta Line, the main railway connection to Europe, was presented.

The undertaking – in which Teixeira Duarte is joined by its affiliate SOMAFEL, S.A., working within this specific area of the railway works – consists of the comprehensive renovation of 14 kilometres of railway, with the aim of stabilizing the rail platform and improving the drainage system, treating and stabilizing slopes, adapting the catenary, signalling and telecommunications infrastructures, as well as installing the RCT-TP system.14

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.