Detalhes do Projeto

WASTE WATER TREATMENT PLANT – ALCÂNTARA

Client: City Council of Lisbon
Location: Av. de Ceuta – Lisboa – Portugal
Execution Period: 45 Months

 

Population served: 725.000 inh.
Industrial Population: 25%
Maximum hourly flow: 15.715 m3