SANTA LUZIA CATCHMENT AND WATER TREATMENT PLANT
PUMPING STATIONS, PIPELINES AND ASSOCIATED RESERVOIRS

Owner: Águas do Centro, S.A.
Site: Pampilhosa da Serra – Portugal
Conclusion year: 2006

 

Civil construction, supply and mounting of equipment and electrical installations for the following works:

 

– Construction of a waste water treatment plant with boom raft pumping installed on Sta. Luzia dam.

 

Feeder pipes:

Ø 200 mm  Ductile galvanised iron tubing  7 032 ml

Ø 250 mm  Ductile galvanised iron tubing   1 205 ml

Others  510 ml

 

Reservoirs:

Execution of two chamber reservoir for supply to Pampilhosa  (2 x 300m3 = 600 m3)

Execution of two-chamber reservoir for supply to Oleiros
(2 x 500m3 = 1 000 m3)

 

Total population  22 000 hab

Maximum daily flow  4 900 m3

Maximum hourly flow   305 m3

 

Pumping stations:

 

Water intake:

Power: 2 x 43 a 76 kW

Q=63 l/s

H=53,5 a 98 mca

 

Pampilhosa Pumping Station:

Power: 2 x 37 kW

Q=22,5 l/s

H=108 mca