Detalhes do Projeto
SANTA LUZIA CATCHMENT AND WATER TREATMENT PLANT
PUMPING STATIONS, PIPELINES AND ASSOCIATED RESERVOIRS
Owner: Águas do Centro, S.A.
Site: Pampilhosa da Serra – Portugal
Conclusion year: 2006
Civil construction, supply and mounting of equipment and electrical installations for the following works:
– Construction of a waste water treatment plant with boom raft pumping installed on Sta. Luzia dam.
– Feeder pipes:
Ø 200 mm Ductile galvanised iron tubing 7 032 ml
Ø 250 mm Ductile galvanised iron tubing 1 205 ml
Others 510 ml
– Reservoirs:
Execution of two chamber reservoir for supply to Pampilhosa (2 x 300m3 = 600 m3)
Execution of two-chamber reservoir for supply to Oleiros
(2 x 500m3 = 1 000 m3)
Total population 22 000 hab
Maximum daily flow 4 900 m3
Maximum hourly flow 305 m3
– Pumping stations:
Water intake:
Power: 2 x 43 a 76 kW
Q=63 l/s
H=53,5 a 98 mca
Pampilhosa Pumping Station:
Power: 2 x 37 kW
Q=22,5 l/s
H=108 mca