Detalhes do Projeto

POWER STATION OF LOURIZELA

Client: Generg – Gestão e Projectos de Energia, S.A.
Location: Talhadas do Vouga – Portugal
Conclusion Year: 1992

This project comprised the construction of a gravity concrete dam.

Relevant data:

  • Crest length: 20 ml
  • Height: 9.5 ml
  • Tunnel with a cross section of 5,70 m2: 758 ml
  • Channel: 899 ml
  • Power station with 5,2 MW
  • Pressure shaft: 300 m3
  • Supports of penstock

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.