Owner: Ministère des Ressources en Eau
ONID – Office National de L’Irrigation et du Drainage
Site: Obras de derivação: Hammam Melouane Wilaya: Blida – Argélia
Obras de transferência: Hammam Melouane – Douéra Wilaya: Blida Alger – Argélia
Conclusion year: 2009
Derivation works:
Construction of surface runoff weir, water intake, two decanters, regulation reservoir and hydro mechanical equipment.
Transfer works:
Execution of Ø 2000 mm reinforced concrete and PRV piping over 24km, two pumping stations and hydro mechanical equipment.
Earth movement – 800 000 m3
Transport to deposit – 325 000 m3
Formwork – 56 000 m2
Concrete – 65 000 m3
Steel – 4 300 ton
Ø 2000 mm reinforced concrete piping – 5 000 m
Ø 2000 mm PRV piping – 19 000 m