Detalhes do Projeto

IURD – CENACLE OF ARACAJÚ

Client: Igreja Universal do Reino de Deus
Location: Avenida Adélia Franco x Avenida Tancredo Neves, Lote 01 – Inácio Barbosa
Aracajú/SE – Brasil

Conclusion date: 2018

 

Construction of the Cenacle built by Blocks A, B, C and Central Nave with 2256 places.
The building blocks A and B have ground floor and four floors and the building C, ground floor and three floors. Execution of foundations, reinforced concrete structure, steel structure, roof tiles, masonry, ground floors in reinforced concrete, waterproofng, execution of special installations, sanitary installations, water, sewage, electricity, airconditioning, lifts, gas, visual communication, ceiling coating, walls and floors, and landscaping.

Built-up area: 9,901.63 square meters.

 

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.