Detalhes do Projeto
HEAVY-DUTY MECHANICAL SERVICE CONTRACT INCLUDING BALLAST LEVELLING
Client: Supervia – Trens Urbano
Location: Rio de Janeiro – Brazil
Conclusion Year: 2013
Track geometry correction along 52 km and 31 switches, on the Belford Roxo Branch Line, using a Matisa B41U Switch Tamper and R789 Ballast Regulator.