CONSTRUCTION/OPERATION OF THE ALI MENDJELI WASTE WATER TREATMENT PLANT – ALGERIA
Owner: ONA – Office National de l’Assainissement
Site: Nouvelle Ville Mendjeli – Constantine – Algeria
Conclusion year: 2018
Construction of a Wastewater Treatment Plant (biological treatment).
2440x1220mm “Backelise” Plywood 22 435 m2
Concrete C30/37 (S4) 12 905 m3
Concrete C25/30 (S4) 60 m3
Concrete C16/20 (S3) 1 780 m3
“Water stop” Sealing gasket, 24cm wide 1 620 ml
12mm Concrete frameworks 1 130 880 kg
Bitumen emulsion “Flint-kot” type 4 840 m2
Galvanized steel grid 188 ml
Sealing mortar 13 453 kg
Supply and assembly of a barrier and handrail in 316 L stainless steel (1.10 m high) 665 ml
Supply and assembly of a galvanized steel stair including barrier 36 ml