Detalhes do Projeto

D. LUÍS BRIDGE
RESTORATION OF THE SUPERSTRUCTURE

Client: EP – Estradas de Portugal S.A.
Location: Santarém – Portugal
Execution Period: 6 Months

 

Repair of the superficial and deep concrete; 
Installation of expansion joints with openings ranging from 80 cm to 3 cm, with movements of 1 cm up to 14 cm; 
Waterproofing of the full surface of the bridge’s deck; 
Pavement and signage; 
Installation of lighting in the bridge; 
Repair of drainpipes.