Detalhes do Projeto
WIDE CAMBUÍ CONTAINMENT WITH ANCHORED DIAPHRAGM WALL AND DEEP FOUNDATION WITH BORED AND BARRETTE PILES
Client: Gafisa S.A.
Location: Campinas – São Paulo – Brasil
Execution Period: 3 months
Installation of 0.40 m thick Diaphragm wall: 3,064.86 m²
Installation of 0.40 x 2.50 Barrette Piles: 62.10 m
Installation of 0.40 x 3.20 Barrette Piles: 41.40 m
Installation of Bored Piles
with diameters of 0.90/1.00/1.20/1.30/ 1.50 m 1,629.60 m
Installation of Temporary Tie-Rods with 61T and 81T loads: 822.00 m