
Detalhes do Projeto
WATER MINERALISATION SYSTEM OF THE PORTO SANTO DESALINATION PLANT
Client: IGA – Investimentos e Gestão da Água, S.A.
Location: Porto Santo – Madeira – Portugal
Execution Period: 4 Months
Demolition works, earthworks and retaining system
Execution of reinforced concrete structures – tank and filter chamber
Execution of PRFV (reinforced polyester fibre glass) structures – stairs / platforms / balconies
Execution of drainage systems
Execution of hydraulic installations:
Pipes – PEHD / PVC
Equipment – filters / booster set / electric pumps / valves
Execution of electrical installations, automation and instrumentation:
Modification of electric board / circuits
Alteration, expansion and reprogramming of automates
Installation of PH / conductivity / turbidity readers