Detalhes do Projeto

WASTE WATER TREATMENT PLANT – BEIROLAS

Client: City Council of Lisbon
Location: Beirolas – Lisboa – Portugal
Execution Period: 45 Months

 

Population served: 250.000 inh.
Industrial Population: 68%
Maximum hourly flow: 3.880 m3
Maximum daily flow: 50.000 m3