Detalhes do Projeto

VSE TIETÊ LINE 06 SÃO PAULO SUBWAY

Client: Consórcio Expresso Linha 6 – CEL6
Location: Rua Eng. Edgard Ferreira de Barros de Barros Junior – São Paulo – Brasil
Execution Period:  5 months

 

Installation of vertical Bored Piles with metal casing and stabilizing fluid, including concreting and conventional armoring, in soil with SPT below and above 50 strokes, with an auxiliary 200 ton crane, compatible with the service foreseen in the project, relating to the suspension of approximately 50 ton armor.

Amount of work

Ø 240 cm piles 1,112.98 m³

Drilling of Ø 0.80 m CCP type vertical Jet-Grouting columns:

SOIL drilling 4,600.00 m

Ascending hydraulic pre-rupture 1,155.52 m³

Installation of CCP type columns 2,311.04 m³

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.