Detalhes do Projeto

TUNNEL OF THE METRO OF LIMA STAGE 1B (CONSTRUCTION)

Client: CONSORCIO CONSTRUCTOR M2 LIMA
Location: Lima – Peru
Execution Period: 15 Months

 

Contract work consisting of excavation, application of primary support and definitive support for 1.159 m of tunnel with a variable section of 68,4 m2 to 158,7 m2 and a 24.5 m deep shaft with a diameter of 18 m and a section of 246 m2. The total estimated excavation volume is 111.000 m³, the estimated concrete volume is 14.000 m³ and the amount of steel to be applied is 786 tons.

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.