Detalhes do Projeto

TORRES NOVAS DISTRICT HOSPITAL

Client: Ministry of Health
Location: Torres Novas – Portugal
Execution Period: 43 Months

 

Capacity: 144 beds
Number of floors: 7
Plot area:  57.504 m2
Deployment area: 8.883 m2
Floor area: 30.593 m2

Earthworks: 56.100 m3
Concrete: 12.100 m3
Steel: 1.463 ton
Formwork: 64.816 m2
Masonries: 41.000 m2

Electrical network
Lifts
Transformer station
Transformers
Centralised Technical Managament
Water and Sewage Network
Supply Central
Firefighting Central
Reserve and Stabilisation Tank
Sanitary Hot Water Tanks  2×4000 l + 2×2500 l
Water Treatment
Thermal Central
Boilers 1.000.000 Kcal/h: 3 un
Chillers 497 Kw: 2 un
Ar conditioned
Heating Network
Medical Gases
Sterilisation (steam, hot air and ethylene oxide autoclave)
Kitchens (200.000 meals/year)
Security, fire detection and combat
Laboratories: 1.060 m2

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.