Detalhes do Projeto
SETE RIOS STATION AND INTERFACE
Client: REFER – Rede Ferroviária Nacional, E.P.
Location: Sete Rios – Lisboa – Portugal
Execution Period: 10 Months
Contract job for the finishes of the railway station Sete Rios with connection to the Metro, comprising mainly the following works:
Metallic structures of the platforms;
Metallic structure of the passengers building;
Lifts and escalators;
Civil works of the passengers building.
Metallic structures: 1 483 tons
Escalators: 24 unit
Spider Glass curtain type façade: 1 453 m2
Metallic cladding: 7 500 m2
False ceilings: 7 000 m2
Epoxy coating: 10 000 m2
Metallic covers: 8 000 m2