
Detalhes do Projeto
SÃO JOÃO HOSPITAL
DESIGN/BUILD OF THE BUILDING FOR THE COGENERATION PLANT
Client: Such-Dalkia – Serviços Hospitalares, A.C.E.
Location: Alameda Professor Hernâni Monteiro – Porto – Portugal
Execution Period: 16 Months
Earthworks, foundations and reinforced concrete superstructure, brick structures, walls and pavement coating / cladding with ceramic and vinyl materials, aluminium sashes and frames, Capotto, Alucobond, iron doors and guards, painting, urban layout, electric installations, HVAC, water and sewage.
Electrical maximum power: 7,3 mW