Detalhes do Projeto

REMODELLING OF RIO DE MOURO HALT

Client: REFER – Rede Ferroviárina Nacional, E.P
Location: Rio de Mouro – Sintra – Portugal
Execution Period: 26 Months

 

Work integrated in the remodelling of existing railway infrastructures in the Railway line of Sintra and whose object was the remodelling / construction of Rio de Mouro halt, with a length of approximately 1.600 meters (between Pk 19+400 and Pk 21+000), including the execution of:

An underground station with an underpass for urban traffic (at km 20.720) and a pedestrian underpass at Pk 20+480, north-west of the station. Both underpasses required the suspension of the track;
Execution of the passengers’ quay in both tracks, with 69 m of useful width and a length of 220 m;
Execution of a full coverage of the station , with a length of 240 m, an useful width of 19,20 m, with no intermediate support points in its inner area, composed of a set of 13 metallic hoofs with opaque and translucent precast parts positioned longitudinally aligned with the track.
Execution of the road – railway interface with the parking lot for 6 buses, sheltered by a cover with metallic structure with a length of approximately 83 meters and a width of 64 meters and a car park with capacity for 340 cars.

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.