Detalhes do Projeto

RAILWAY STATION QUELUZ/BELAS AND QUADRUPLICATION OF THE RAILWAY TRACK

Client: REFER – Rede Ferroviárina Nacional, E.P
Location: Queluz/Belas – Portugal
Execution Period: 38 Months

 

Works carried out:

Quadruplication of the track between Pk 11+741 and Pk 12+279 (538 m), that entailed the execution earth retaining reinforced concrete walls (with and without anchors), to enlarge the existing platform.
Construction of prestressed reinforced concrete viaduct Jamor valley with a length of 196 m, divided in 11 spans, of which 9 with 18,5 m and the two at both ends with 14,75 m.
Construction of the new railway station Queluz/Belas with mixed structure (reinforced concrete / metallic) which develops transversally and over the railways.
Construction of passage ways and road-railway interfaces, pedestrian underpasses and a parking under the viaduct’s deck with 212 places to supprt the railway station.

Main quantities:
Excavation: 30.000 m3
Formwork: 24.500 m2
Piles Ø 2000 mm: 500 m
Concrete: 13.000 m3
Steel A400 NR: 1.500.000 kg
Prestress Steel: 215.000 kg
Trestle: 47.000 m3