Detalhes do Projeto

QUADRUPLICATION OF THE TRACK BETWEEN QUELUZ AND MASSAMÁ AND CONSTRUCTION OF THE NEW RAILWAY STATION

Client: REFER – Rede Ferroviárina Nacional, E.P
Location: Queluz/Massamá – Portugal
Execution Period: 24 Months

 

Main building (covered area): 1.600 m2
Total area of the interface: 15.000 m2
Earthworks: 178.140 m3
Concrete: 10.000 m3
Steel A400 NR: 1.500.000 kg
Anchored retaining walls: 2.500 m2
Full renovation and quadruplication of the track including overhead contact line (catenary) works: 8.200 lm
Provisional track bypasses: 1.373 lm