Detalhes do Projeto
POWER STATION OF LOURIZELA
Client: Generg – Gestão e Projectos de Energia, S.A.
Location: Talhadas do Vouga – Portugal
Conclusion Year: 1992
This project comprised the construction of a gravity concrete dam.
Relevant data:
- Crest length: 20 ml
- Height: 9.5 ml
- Tunnel with a cross section of 5,70 m2: 758 ml
- Channel: 899 ml
- Power station with 5,2 MW
- Pressure shaft: 300 m3
- Supports of penstock