Detalhes do Projeto

POWER STATION OF LOURIZELA

Client: Generg – Gestão e Projectos de Energia, S.A.
Location: Talhadas do Vouga – Portugal
Conclusion Year: 1992

This project comprised the construction of a gravity concrete dam.

Relevant data:

  • Crest length: 20 ml
  • Height: 9.5 ml
  • Tunnel with a cross section of 5,70 m2: 758 ml
  • Channel: 899 ml
  • Power station with 5,2 MW
  • Pressure shaft: 300 m3
  • Supports of penstock