PACOTE N2 VALE – SÃO LUIS DO MARANHÃO INSTALLATION OF CONTINUOUS FLIGHT AUGER PILES
Client: Vale S.A.
Location: São Luis – Maranhão – Brasil
Execution Period: 6 months
Installation of the foundation of the track beams of two new ore stackers / reclaimers.
Amount of work
400 mm CFA piles 700 m
500 mm CFA piles 25,000 m
600 mm CFA piles 9,900 m
Static load tests on continuous flight auger piles 10 un