Detalhes do Projeto

MODERNISATION NORTHERN LINE
SUBSECTION 3.2 – QUINTANS/OVAR

Owner: REFER – Rede Ferroviária Nacional, E.P.
Site: Linha do Norte PK 265+500 / 296+800 Quintans/Ovar – Portugal
Conclusion year: 2005

 

Track Engineering involved in the Project:

General civil construction works, track and overhead power catenaries, comprising earth moving, drainage  and ancillary works, replacing existing Ponte de Antuã (45 metres) by other on a design and build basis, total track renewal works, traction return and earthing protection system, remodelling of Cacia and Estarreja stations and Avanca halts, station structure at Aveiro, road subway at Av. Lourenço Peixinho, support walls, engineering project, fencing, parallel paths, preparatory works, general backup works to the signalling and telecommunications project.

 

Double Track

Project speed = 220 km/h

LP5 type overhead power

 

Works on railway line    65  km

Overhead Power Catenary works including traction return      65  km