
Detalhes do Projeto
JURONG ARACRUZ SHIPYARD
FOUNDATIONS OF THE SOUTH PIER, SOUTH FINGER AND EXTENSION OF THE SOUTH PIER WITH BORED PILES
Client: Jurong Shipyard
Location: Aracruz – Espiríto Santo – Brazil
Conclusion year: 2015
Installation of 750 Ø 1,000 mm bored piles at a depth of 48 meters in the foundations of the shipyard’s berthing structures.