Detalhes do Projeto

IURD –  CENACLE OF CEILÂNDIA

Client: Igreja Universal do Reino de Deus
Location: CNM 02 BL F Lote 1/21/2 – Ceilândia Centro – Ceilândia – Brasília/ DF – Brasil
Conclusion year: 2016

 

Drilling service with hand-dug wells together with pillars for assessing the causes of settlements occurred, including the execution of two rotational drillings with SPT.
After confirming the causes of settlements duly recorded in the technical report, a reinforcement project was prepared and the reinforcement services were executed, which consisted of the execution of 4 drums dug into each of the pillars that presented settlements.