Detalhes do Projeto

INSTALLATION OF PILES AT ITAPAIÚNA BRIDGE

Client: Consórcio Complexo Itapaiúna
Location: Av. Guido Caloi, 252 – Jardim São Luís – São Paulo – Brasil
Execution Period:  6 Meses

 

Installation of deep, large-diameter pile foundations (excavation, armoring and concreting) in soil and rock.

Amount of work

Ø 85 cm piles 120 m

Ø 120 cm piles 298 m

Ø 150 cm piles 334 m

Ø 160 cm piles 215 m

Ø 180 cm piles 215 m

Driving 80, 12 m long NA-9C type Steel Sheet Piles

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.