INSTALLATION OF PILES AT ITAPAIÚNA BRIDGE
Client: Consórcio Complexo Itapaiúna
Location: Av. Guido Caloi, 252 – Jardim São Luís – São Paulo – Brasil
Execution Period: 6 Meses
Installation of deep, large-diameter pile foundations (excavation, armoring and concreting) in soil and rock.
Amount of work
Ø 85 cm piles 120 m
Ø 120 cm piles 298 m
Ø 150 cm piles 334 m
Ø 160 cm piles 215 m
Ø 180 cm piles 215 m
Driving 80, 12 m long NA-9C type Steel Sheet Piles