FUNCHO DAM AND FUNCHO-FRANQUEIRA WATER CONDUIT (1st SECTION)

Owner: Direcção Geral dos Recursos e Aproveitamentos Hidráulicos
Site: Silves – Portugal
Conclusion year: 1993

Camber dam with double curvature, to irrigation and population water supply.

 

Crest length: 165 m

Height: 48,8 m

Width: 7 m

Dam volume: 61 050 m3

Hydrographic basin area: 200 km2

 

Excavation: 100 000 m3

Concrete: 62 000 m3

Reinforcing steel: 700 ton

Formwork: 16 000 m2

 

Construction of a prestressed concrete pipe.

 

Pipe Ø 2500: 2 100 ml

Excavations: 230 000 m3

Backfillings: 20 600 m3

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.