Detalhes do Projeto

DRAINAGE FOR RESIDUAL, RAIN AND IRRIGATION WATERS INCLUDING SUPPLEMENTARY MEASURES TO PREVENT RISING WATER TABLE IN VALE DE EL OUED (SECTION 2) – AERATED LAGOON STATIONS

Owner: ONA – Office National de l’Assainissement
Site:  – Argélia
Conclusion year: 2010

Construction of 3 waste water treatment plants, aerated lagoons type, with 40, 42 and 20 hectares respectively.

 

The works consisted in the execution of:

 

  • 3 ventilated ponds (helical aerators);
  • 3 decanting ponds;
  • Sludge dewatering beds;
  • Pre-treatment, flow distributor and connection ducts works;
  • Protection against wind and sand;
  • Operation and accommodation buildings;
  • Accesses and landscaping.

 

Earth movement  1 100 000 m3

Geo membrane  280 000 m2

Geotextile  365 000 m2

Reinforced concrete  2 100 m3

Tubing PEAD  4 600 m

 

Incorporation of hydro mechanical and electromechanical equipment.

Operation and maintenance of complex for 24 months.