Detalhes do Projeto

DOURO LITORAL CONCESSION ROAD

Owner: AEDL, Auto-Estrada do Douro Litoral, S.A.
Site:
A32 – IC2-Oliveira de Azeméis / IP1 (São Lourenço)
A41 – IC24-Picoto / Nó da Ermida (IC25)
A43 – IC29-Gondomar / Aguiar de Sousa (IC24)
Conclusion year: 2011

 

Conception, design, construction, financing, maintenance and operation of 3 highway sections for a 27 year period.

Implementation of toll collection facilities, gateways for billing and electronic equipment for traffic count.

 

  A32 A41 A43
Length 34,7 km 33 km 8,1 km
Interchanges 8 un 10 un 2 un
Profile (No of lanes) 2×2 + 3×3 2×2 + 3×3 2×2
Bridges and Viaducts 11 (4,2 km) 12 (4,3 km) 5 (1,1 km)
Tunnels 1 (300 m) 1 (465 m)
Over and under passes 29 PS + 22 PI 23 PS + 17 PI 5 PS + 3 PI
Excavation 12.250.000 m3 6.500.000 m3 2.000.000 m3
Landfill 11.600.000 m3 7.000.000 m3 1.500.000 m3
Hydraulic passages 9.750 m 6.000 m 2.350 m
Drains 105.000 ml 73.250 ml 16.750 ml
Concrete 184.000 m3 210.000 m3 33.000 m3
Stell (A500 NR) 17.250 ton 20.250 ton 3.500 ton
Pre-stressed 1.850 ton 3.850 ton 300 ton
Betuminous pavements 500.000 ton 402.250 ton 92.750 ton
Tout-Venant  1.100.000 ton 1.100.000 ton 225.000 ton
Fiber optic infrastructure 35 km 33 km 8,1 km

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.