Detalhes do Projeto

DOURO LITORAL CONCESSION ROAD

Owner: AEDL, Auto-Estrada do Douro Litoral, S.A.
Site:
A32 – IC2-Oliveira de Azeméis / IP1 (São Lourenço)
A41 – IC24-Picoto / Nó da Ermida (IC25)
A43 – IC29-Gondomar / Aguiar de Sousa (IC24)
Conclusion year: 2011

 

Conception, design, construction, financing, maintenance and operation of 3 highway sections for a 27 year period.

Implementation of toll collection facilities, gateways for billing and electronic equipment for traffic count.

 

  A32 A41 A43
Length 34,7 km 33 km 8,1 km
Interchanges 8 un 10 un 2 un
Profile (No of lanes) 2×2 + 3×3 2×2 + 3×3 2×2
Bridges and Viaducts 11 (4,2 km) 12 (4,3 km) 5 (1,1 km)
Tunnels 1 (300 m) 1 (465 m)
Over and under passes 29 PS + 22 PI 23 PS + 17 PI 5 PS + 3 PI
Excavation 12.250.000 m3 6.500.000 m3 2.000.000 m3
Landfill 11.600.000 m3 7.000.000 m3 1.500.000 m3
Hydraulic passages 9.750 m 6.000 m 2.350 m
Drains 105.000 ml 73.250 ml 16.750 ml
Concrete 184.000 m3 210.000 m3 33.000 m3
Stell (A500 NR) 17.250 ton 20.250 ton 3.500 ton
Pre-stressed 1.850 ton 3.850 ton 300 ton
Betuminous pavements 500.000 ton 402.250 ton 92.750 ton
Tout-Venant  1.100.000 ton 1.100.000 ton 225.000 ton
Fiber optic infrastructure 35 km 33 km 8,1 km