Client: ALNG – Angola LNG, Limited
Location: Soyo – Angola
Conclusion Year: 2015

 

This work comprised the design and construction of bridge-wharf (jetty) to provide support to maritime services related to the transport of natural gas coming from the Angola LNG – Liquefied Natural Gas plant; the execution of modular cantilevered structure with reinforced concrete deck, with 55 spans of 5,325m and indirect foundations, using metal tubular piles driven 29 m deep through vibration.
The pier level is +3.30 and the dredging bottom level is -7.80m.
The geological formation is composed of fine and medium grained sand, muddy in the surface layers and clayey in the underlying layers, increasing its compactness with depth.

Relevant data:

Length: 295 m
Width: 8,7 m
Concrete: 2 400 m3
Construction steel: 450 ton
Ø 965 mm x 19 mm metal piles: 1 500 ton
50 m x 8 m provisional metal bridge: 120 ton

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.