Detalhes do Projeto
CONSTRUCTION OF THE CURALHA DAM AND IRRIGATION NETWORK
Client: Direção Regional de Agricultura de Trás-os-Montes
Location: Chaves – Portugal
Conclusion Year: 1990
This project comprised the construction of an earth dam with impermeable core.
Relevant data:
- Crest lenght: 210 m
- Height: 16 ml
- Irrigation network: 3 400 ml
- Secondary network: 4 100 ml
- Hydrographic basin area 5 km2