CONSTRUCTION OF THE SÃO DOMINGOS DAM
Client: Câmara Municipal de Peniche
Location: Peniche – Portugal
Conclusion Year: 1993
This project comprised the construction of a rockfill dam with a core clay, for irrigation and water supply.
Relevant data:
- Crest length: 280 m
- Height: 39 m
- Width: 8 m
- Volume of dam: 260 000 m3
- Hydrographic basin area: 40 km2
- Excavation: 75 000 m3
- Backfilling: 275 000 m3
- Concrete: 6 200 m3
- Reinforcing steel: 450 tn
- Formworks: 20 000 m2
Groutings:
- Perforation: 20 000 ml
- Cement: 2 100 tn