4TH AND 5TH SECTIONS OF THE ALVITO/PISÃO CANAL OF THE PRIMARY IRRIGATION SYSTEM OF THE MULTIPLE PURPOSES DEVELOPMENT OF ALQUEVA

Client: EDIA – Empresa de Desenvolvimento e Infra- Estruturas do Alqueva, S.A.
Location: Cuba do Alentejo Pisão – Portugal
Execution Period: 25 Months

 

Construction of the 4th and 5th sections of the Alvito-Pisão canal of the primary irrigation system multiple purposes development of Alqueva, with a length of 15,578 km, with two different types of section:

  • Open sky trapezoidal canal, coated with concrete reinforced wit metallic fobres, with a height ranging from 3,40m to 3,60m and a width of 2,50m.
  • Covered rectangular canal, with closed frame structure of reinforced concrete double span with variable section (width 2 x 3,80m and 2 x 3,65m and height from 3,40m to 3,60m), executed using the system “cut and cover”.

Water inlet: 4 unit
Regulation structures: 3 unit
Emergency spillways: 4 unit
Culverts under the canal: 18 unit
Overpasses: 13 unit
Fauna passages: 3 unit
Rescue and access to the canal ramps : 25 unit

Execution of service passage ways, fences, gates, hydro mechanical equipment, electrical installations, automation and remote management.

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.