1st STAGE OF THE REHABILITATION AND REQUALIFICATION (UPGRADING) OF SÃO BRÁS DE ALPORTEL ORGANIC WASTE PROCESSING PLANT
Owner: ALGAR – Valorização e Tratamento de Resíduos Sólidos, S.A.
Site: São Brás de Alportel – Faro – Portugal
Conclusion year: 2013
This contract job comprised the following activities:
– Repair of the reinforced concrete elements;
– Treatment of reinforced concrete surfaces;
– Treatment of steel surfaces;
– Reinforced concrete structures;
– Demolition of concrete pavements;
– Earth moving works/earthworks;
– Waterproofing;
– Automatic gates;
– Soil consolidation using cement slurry grouting;
– Seismic reinforcement using metal structures;
– Electrical installations;
– Electromechanical installations;
– HVAC installations;
– Hydraulic installations;
– Fire-fighting safety;
Main Quantities:
Repair of the concrete elements 450 m2
Sealing and treatment of cracks and joints 2 300 ml
Protective painting of the concrete elements 2 050 m2
Pickling and painting of metal silos 2 100 m2
Concrete for structural elements 430 m3
Steel for reinforced concrete elements 35 550 kg
Steel for seismic reinforcement structures 27 000 kg
Steel tethers for seismic reinforcement 688 un
Formworks 960 m2
Demolition of concrete pavements 3 300 m2
Execution of finished concrete pavements 3 300 m2
Excavation and landfill 7 200 m3
Roofing waterproofing 820 m2
Cement slurry grouting on foundation soils 80 m3
Transformer substation 1 un
Emergency generator unit 1 un
Deodorizing system by activated carbon filter 1 un