GARDUNHA TUNNEL

Client: Junta Autónoma de Estradas
Location: Alpedrinha – Portugal
Execution Period: 23 Months

 

Construction in the bypass to IP 2, between Fundão and Alpedrinha, of a coated tunnel with a length of 1.525 m and 80 m2 of cross section, with 67 meters executed in open sky (“cut and cover”).
Execution of road section with a total length of 1.850 meters, 1 underpass, 1 agricultural crossing, the design, supply and installation of equipment – security, control, ventilation and lighting – to be installed in the section in tunnel.
Operation and maintenance for five years by the contractor.

Exacation: 281.000 m3
Backfill: 315.000 m3
Total quantity of concrete: 26.000 m3

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.