Detalhes do Projeto

CIRCUNVALAÇÃO WATER DUCT – INITIAL AND INTERMEDIATE SECTIONS – PACKAGE III

Client: EPAL – Empresa Pública das Águas Livres, S.A.
Location: Alhandra – Portugal
Execution Period: 24 Months

 

Execution of a section of a drinking water duct under pressure, Ø 1800 mm with a length of 9.710 meters, between the Arcena reservoir diversion and the one of Santa Iria de Azoia.

Pavement removal and replacement: 2.224 m2
Excavation for the project stake out (stripping with blade): 101.215 m3
Excavation for the project stake out (ripper or explosives): 26.883 m3
Gravel and grit in the pipeline backfill: 15.274 m3
Sand bed: 33.572 m3
Loading and transport to a disposal site: 52.387 m3
Backfill with excavated soils: 42.139 m3
Boxes (vents, valves, etc.): 36 unit
Concrete: 6.552 m3
FFD pipes Ø 1800 mm: 9.505 lm

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.