Detalhes do Projeto

WATER SUPPLY TO EASTERN ALGARVE ALCANTARILHA DUCT AND LIFTING STATION – INITIAL TANKS

Client: Águas do Barlavento Algarvio, S.A.
Location: Alcantarilha – Algarve – Portugal
Execution Period: 20 Months

 

Earthworks for the implementation of the duct with pavement removal and resetting;
Execution of the anchoring blocks, valve chambers, bottom discharge and air valves;
Supply and assembling of concrete pipes and accessories with steel core, Ø 1200 mm;
Supply and assembling of cast iron pipes and accessories ductile, Ø 300 mm;
Supply and assembling of hydromechanical equipment (valves, pumps, etc.);
Supply and assembling of steel pipes and accessories;
Execution of improvements works in the duct implementation strip;
Supply and application of command and signage cable;
Construction of 2 reinforced concrete tanks
Algoz 8337  m³
Silves 10.137  m³

Excavation in trenches: 114.016  m³
Trenches backfill with crushed stone and : 14.287  m³
Trenches backfill: 70.798  m³
Loading and transport to a disposal site: 43.218 m3
Concrete D160: 238  m³
Concrete B25: 5.331  m³
Formwork: 17.059 m2
Steel A400 NR: 322 tons
Pipe PVC Ø 90 mm: 42.500 lm
Pipe FFD Ø 300 mm: 12.522 lm
Concrete cylinder pipe Ø 1200 mm: 13.640 lm
Painting with bituminous asphalt: 5.242 m2
Remote control and signalling cable TE1HEAV: 42.500 lm
Quarry run and macadam: 2.800  m³