Detalhes do Projeto
HYDROELECTRIC POWER PLANT OF S. PEDRO DO SUL
Client: Hidrocentrais Reunidas, S.A.
Location: S. Pedro do Sul – Portugal
Execution Period: 12 Months
Concrete weir
Capping: 40 lm
Height: 15 lm
Plant with an installed capacity of 8,1 Mw
Fish ladder (fishway)
Earthworks: 33.500 m3
Concrete: 7.350 m3
Rebar cages for concrete: 454 tons
Formwork: 7.500 m2