Detalhes do Projeto

CONSTRUCTION OF THE SÃO DOMINGOS DAM

Client: Câmara Municipal de Peniche
Location: Peniche – Portugal
Conclusion Year: 1993

This project comprised the construction of a rockfill dam with a core clay, for irrigation and water supply.

Relevant data:

  • Crest length: 280 m
  • Height: 39 m
  • Width: 8 m
  • Volume of dam: 260 000 m3
  • Hydrographic basin area: 40 km2
  • Excavation: 75 000 m3
  • Backfilling: 275 000 m3
  • Concrete: 6 200 m3
  • Reinforcing steel: 450 tn
  • Formworks: 20 000 m2

Groutings:

  • Perforation: 20 000 ml
  • Cement: 2 100 tn

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.