Detalhes do Projeto

ALVORADA BRASÍLIA HOSPITAL – INCREASE OF THE SUBSTATION’S CAPACITY

Client: ESHO Empresa de Serviços Hospitalares S.A.
Location: SEP SUL EQ 710/910 CJ-B S/Nº BL 01 e 02, 1 – Asa Sul – Brasília – Distrito Federal – Brasil
Conclusion year: 2016

 

Refurbishment to increase the Substation’s power capacity to 1200 KVA, including the assembly of a 700 KVA generator set and the installation and supply of two 100 KVA
No-break.