Detalhes do Projeto
DOURO LITORAL CONCESSION ROAD
Owner: AEDL, Auto-Estrada do Douro Litoral, S.A.
Site:
A32 – IC2-Oliveira de Azeméis / IP1 (São Lourenço)
A41 – IC24-Picoto / Nó da Ermida (IC25)
A43 – IC29-Gondomar / Aguiar de Sousa (IC24)
Conclusion year: 2011
Conception, design, construction, financing, maintenance and operation of 3 highway sections for a 27 year period.
Implementation of toll collection facilities, gateways for billing and electronic equipment for traffic count.
A32 | A41 | A43 | ||||
Length | 34,7 | km | 33 | km | 8,1 | km |
Interchanges | 8 | un | 10 | un | 2 | un |
Profile (No of lanes) | 2×2 + 3×3 | 2×2 + 3×3 | 2×2 | |||
Bridges and Viaducts | 11 (4,2 km) | 12 (4,3 km) | 5 (1,1 km) | |||
Tunnels | 1 (300 m) | 1 (465 m) | – | |||
Over and under passes | 29 PS + 22 PI | 23 PS + 17 PI | 5 PS + 3 PI | |||
Excavation | 12.250.000 | m3 | 6.500.000 | m3 | 2.000.000 | m3 |
Landfill | 11.600.000 | m3 | 7.000.000 | m3 | 1.500.000 | m3 |
Hydraulic passages | 9.750 | m | 6.000 | m | 2.350 | m |
Drains | 105.000 | ml | 73.250 | ml | 16.750 | ml |
Concrete | 184.000 | m3 | 210.000 | m3 | 33.000 | m3 |
Stell (A500 NR) | 17.250 | ton | 20.250 | ton | 3.500 | ton |
Pre-stressed | 1.850 | ton | 3.850 | ton | 300 | ton |
Betuminous pavements | 500.000 | ton | 402.250 | ton | 92.750 | ton |
Tout-Venant | 1.100.000 | ton | 1.100.000 | ton | 225.000 | ton |
Fiber optic infrastructure | 35 | km | 33 | km | 8,1 | km |